ABOUT US SERVICES PROJECTS NEWS CONTACT HOME

News...


Dartmouth College Undertakes Major Roofing Project

Friday, April 4, 2014

VALLEY BUSINESS JOURNAL

SPRING CONSTRUCTION
 
By GUY C. DENECHAUD
The most visible construction project taking place on the Dartmouth College campus this spring is a major re-roofing of the east side of the Alumni Gym with copper batten seam material. Engelberth Construction began work on the site in March, with completion anticipated before the fall semester begins in September.

The main roof at the gym over the Karl Michael pool is about 22,000 square feet in size, and the roof over the alternate Spaulding Pool adds additional footage. The job consists of the removal and replacement of the existing copper roofing, over-framing, and insulation of the existing roof as well as the replacement of drywall and insulation around the Karl Michael Pool. Structural upgrades to the pool itself, and painting of the new drywall and existing steel trusses, are also included, according to Glenn Terk, project manager for Engelberth. The entire project cost is estimated to approach $3.9 million. The project will only deal with the roofs over Karl Michael pool and Spaulding pools. The roof on the west side, over the intramural gym, was replaced during the summer of 2012.

According to Patrick O’Hern, senior project manager of Facilities Operations & Management at Dartmouth College, the Alumni Gymnasium is a truly historic building that was erected in 1909, at which time it was considered to be one of the most complete gymnasiums in the eastern U.S. The spacious Alumni gymnasium contains the two swimming pools, with modern Karl Michael championship pool having bleachers for 400 spectators. “There are also intramural basketball courts, squash courts, a jogging track, fencing lanes, and a rowing room complete with training tanks within its 129,000 square feet,” said O’Hern. A $12 million renovation to Alumni Gymnasium was completed in 2005. That project included the creation of a 14,000 square foot recreational fitness center; eight new multi-use fitness spaces, comprising about 10,000 square feet; infrastructure improvements to Karl Michael Pool; handicapped accessibility; and an elevator serving the gym’s three levels.

Terk said that a radiant heating loop and associated equipment is required on the north columns of the Karl Michael pool, and adjustments to the duct plenums will be needed as part of the project this year. Sprinkler system work, and minor electrical changes will be needed to support installation of the new mechanical equipment, and reworking of existing finishes is also included in the plan.

“Access to the underside of the main roof, and keeping the rest of the gym operational with guests and staff safe from construction activities will compound the challenges of this job, particularly with the importance of an on-time completion so that there is minimal disruption to any of the College’s activities,” added Terk.





RECENT NEWS

Rodd Roofing Is Replacing Slate Roof At Caledonia County Courthouse
Settler's Green Expands
Story Land
Passumpsic Bank Lyndonville
Amtrak Station
Lamoille County Court House renovations
Our Lady of Providence
LandAir gets a new roof!
Union Bank St. Johnsbury
Private Residence
UVM - Perkins Hall
Another Satisfied Customer
Fairbanks Scales
Residential roofing at its finest
Rodd Roofing recognized in Metal Construction News
IBM
Roofing work is in full swing at the Sweet Tree processing center in Island Pond.
L.L. Bean is coming to Church Street in Burlington, VT this fall.
From Elementary to High School in Montpelier
A Summer of Batten Seam Copper Roofing at Dartmouth College
Union Elementary School
Datamann Inc. - Building a long term relationship.
Dartmouth College Undertakes Major Roofing Project
PHASE 1 COMPLETE!
Rodd Roofing has been awarded a contract to install over 80,000 square feet of new roofing for Wood Creek Capital.
Standing Seam Metal Roof on Upwey Barn
There's no substitute for experience, as the axiom goes. And when it comes to roofing, no name has more experience than Rodd.
HOME
About Us
Services
Projects
News
Contact
WHAT WE OFFER
Cedar Shingle Roofs
Copper Roofing
Standing Seam Roofs
Shingled Roofs
Single Ply Roofing
Slate Roofs
Tile Roofs
ABOUT RODD ROOFING
There is no substitute for experience and quality workmanship. They are synonymous with Rodd Roofing. When it comes to the business of roofing, no one has better experience or quality than Rodd Roofing. Whether it is residential or commercial, we can meet all your roofing needs.

We have over 90 years of experience installing quality roofs throughout Vermont and New Hampshire, ranging from detailed roofs like slate, cedar shingle, copper, standing seam metal, and tile to extensive single-ply membrane roofs. Our technicians are professionals in every way, taking the time to do the job right the first time. Several of them have been with the company up to 40 years.
GET IN TOUCH
Rodd Roofing Company
PO Box 69
49 Perkins Street
St. Johnsbury, Vermont
(800) 331-7663
(802) 748-4555
FAX: (802) 748-3069
E-MAIL: info@roddroofing.com
© 2015 All Rights Reserved.
Web Design by Cambium Group, LLC
  Serving Vermont and New Hampshire with offices in St. Johnsbury, Burlington, Montpelier and Greensboro, Vermont.